Three years after the school started a Parish Assembly was called and it was agreed that a school must be built.
Committee appointed
A committee was set up to find a site, negotiate a price, prepare plans and estimates of total cost.
They reported back within three months and the parish decided to go ahead, voting £500 to cover the acquisition of three vergées of land at £153 and build a boundary wall. One pound notes guaranteed by the parish were issued to help raise the money. Architect Aldophus Curry drew up plans, which were modified by the Education Department in Whitehall.
It was not until 1899 that a tender by Springate and Baker, Gorey-based builders, was accepted in the sum of £2,836 10s and a further £3,000 was voted by the Parish Assembly. It was agreed to ask the States to pay £1,534, representing half the total cost.
A commemorative stone, which is set above the main door of the school, was laid by Constable Richardson Le Brun on 19 October 1899, and he was presented with a silver trowel to commemorate the event.
Numbers treble
The school opened on 1 October the following year, with 59 pupils, which was to treble within two years.
The first headmaster Mr Charles de St Paer reported his concern that many of his pupils could not speak English and school inspectors described the school as 'difficult' in its early years.
Quéruée School
The school merged at some point with a private establishment, Quéruée School, but it is not known where this was located
Absenteeism
Serving an almost entirely rural parish, the school suffered badly from absenteeism in the potato planting season in February and March, and the digging period of June, and on occasions the school would close altogether. This continued in several country parishes until the Occupation.
Extensions
Improvements to the building commenced in July 1980 and again in 1991. In 1980 most teaching areas were modified, indoor toilets installed, a staircase erected to give access to a new classroom in the loft, and a new hall built. The Commemorative stone was resited to allow a new entrance to be made. When removed, a small box was discovered containing artefacts from 1899. A similar box was made and filled with a collection of artefacts from 1980 and the two boxes now lie side by side behind the resited stone.
In 1991 two infant classrooms and an area to be used as a library were completed. This enabled the Infant department to be housed together in the eastern part of the school. Building work on a new detached nursery classroom with facilities was started on 3 September 1991, and completed at the end of February 1992. Two temporary classrooms were added in the summer of 1996, allowing for the relocation of the staffroom and the creation of a school library.
New Building
The idea of the new building became feasible in 2009 and in 2010 they got the funds to do it. Construction started in 2013 and the grand opening happened in 2016. The total price of the Building was 5.2 Million pounds. The old building has now been turned to A M&S, Mercury Distribution center and a vets.They opened on the 8th January 2020.